Rehabilitation and consolidation

Thanks to its structures & consolidation professionals, PB can claim today that it has a hard-to-match experience in projects that are lasting, time resistant and able to face the unpredictable challenges of nature. Almost all structure consolidation projects carried out following the devastating earthquake in 1977 were designed by Proiect Bucureşti.

  • Consolidation, redevelopment, restoration and renovation of the Romanian Athenaeum

    1992-2004 period

    The consolidation of this important historical monument of architecture was thought to strengthen the capacity of resistance to seismic actions without affecting the central nucleus, highly valuable for its original decorations.

    Consolidation repairs on the columns, the front and the cornice; replacement of the wooden bridging with concrete bridging, the restoration of the timber support and system ventilation channels, strengthening the local walls, arches and pillars.

    The following areas have been arranged, restructured and modernized: the rotunda basement; the small concert hall; the protocol, philharmonic, direction, administration and technical areas.

    The arch was restored and works within the large concert hall were made, like the restoration of the interior coating. The fortification works consisted doubling the current steel structures.

    Anti corrosive protection has been provided for all metal elements of the cupola. Structural interventions in the large concert hall involved the restoration of the original room configuration: increasing the scene with a new area of concrete bridging and the ceiling renewal on the new boxes made after eliminating the staircase access to the main box.

    estoring the main concert hall required mapping and examination of the ornaments to assess the necessary interventions. Fronts restorations have been also completed.

  • Works aimed to strengthen, repair, restore and modernize George Severeanu Collection

    Project development period: 2000

    The museum was built at the end of the XIX century, being classified as a historical and architectural monument. The main building houses the "Mary and Dr. George Severeanu" collection as well as the collections of the numismatic cabinet of Bucharest.

    Facades are decorated with abundantly embellished window framing and specific age style attics.

    Consolidation solutions have been taken into account, to preserve the volumetric analysis and the decorations. On the outside, they comprise rehabilitation of areas affected due to the shrinking land and the underpinning and deepening the foundations. The interior consolidations avoided damaging the walls decorated with different models, fixed mirrors and embellished paneling. Throughout the work special attention was paid to protect its fixed decorations, to remove, renumber and restore the paneling and renew the ceiling decorations after the wax had been taken.

    The reorganizing of the museum circuit includes renouncing to a subsequently built wall for the circuit fluidization and the improvement of the lighting system adapted to specific exhibits - especially for the numismatic collection. An exterior lighting system has been provided in order to enhance the importance of the monument.

  • Consolidation, repairing, restoration and modernizing of Theodor Aman Museum

    Date of the initiation of the project: 2002

    The museum built in 1869, after the plans of painter Aman, is a building in a renascent style, having on the front inset portraits and medallions representing personalities and symbols of the Renaissance period, models of creation for the painter.

    The room’s interior are richly decorated in many techniques – paint on canvas, frescoes a Lecco, decorative paintings, sculptures but also furniture, paneling, and objects partially made by the painter or other important artists. Due to these elements, the building has been declared a historical monument of architecture.

    The interventions on the building structure had taken into consideration the preservation of the volumes, exterior decorations and the richly decorated interior. The solution, was dressing the inside walls and adding concrete floor.

    The project is designed to eliminate all the damp from the basement, partially ground floor, through suitable solutions. For the restoration, there have been taken castings from all the crockery and the structures.

    For the interior, it has been suggested to index, undo, hygiene and restore all of the inside decorations, and also to protect the art – the paintings and sculptures were restored by certified specialists.

    There has been established a new system of heating, with areas that have elements in the floor, the central heating, a new illuminating system both inside and outside (to make the monument more attractive), and there have been eliminated the brutal technical interventions from the main facades (embranchment, gases, etc.).

  • Consolidation, restauration, modernization – Olteniei Museum – Craiova

    Development period: 2007

    The building is an historical and architectural monument.

    Height scheme: basement, ground floor, first floor and attic

    Design objectives:

    • the consolidation process, according to the geotechnic study and with technical and biological expertise, in addition with the historical study conclusions and the design plan of the beneficiary

    • the restoration of the edifice, according to the historical study and the functional demands imposed by the design plan

    • the modernization of the installations system. The restoration and the consolidation interventions, were done according to the historical study that attested the initial structural and architectural plan of the building. The restoration works of the facades and on the covers, were done with the historical study and the biodegradable expertise.

  • Wilson Apartments Block

    Development period: 1934-1936

    The edifice was built between 1934-1936 and is known as the ‘Wilson’ Building, which consists one of the specific architectural elements of Bucharest. Badly damaged in the 1977 earthquake, the building was consolidated to ensure the safety of the commercial spaces and apartments.

  • Hotel Lebada

    Built in the green east side area, the Lebada hotel represented the metamorphosis of the an old historical building from the XIX century, into a modern hotel with accomodation capacity of 400 people, restaurants, conference halls, saloons, shops...

  • Museum of Art Collections

    Proiect Bucuresti designed the technical plan for the consolidation and rearrangement of this architectural monument, that holds unique artworks. The building was equipped with modern installation systems, preserving and enhancing the architectural characteristics of the monument.

  • Telecomunication Palace

    Symbol building of the 1930-1935 period, with architectural particularities, was restored and modernized to adapt to the needs of a hi-tech telephone company. The volumetric and architectural characteristics were preserved. The building works were done between 1996-2004 with technology proposed by Proiect Bucuresti, to allow the continuance of the activities, during the upgrading.